• Delayed Integrity Check for IEC 61850 Communication 

      Gudmestad, Racin (Masteroppgave/UIS-TN-IDE/2020;, Master thesis, 2020-06-15)
      Electrical substations transform voltage from high to low, or low to high for transmission and distribution, and are a critical part of our infrastructure. The state of a substation is continuously measured for monitoring, ...
    • Saving Nine Without Stitching in Time: Integrity Check After-the-fact 

      Gudmestad, Racin; Houmb, Siv Hilde; Jaatun, Martin Gilje (Chapter, 2021)
      Electrical substations transform voltage from high to low, or low to high for distribution and transmission, respectively, and are a critical part of our electricity infrastructure. The state of a substation is continuously ...